Allston Yards - Building A

Architect

Stantec

New stick over podium mixed use building featuring a Stop & Shop at level 2, Home Goods, other retail and parking on level 1, residential on levels 3-6, and 2 levels of below grade parking.

Unique structural challenges: 1.) 60' Long 4' Deep x 7' Wide PT Transfer Beams. 2.) Secant Pile Wall installed < 10' from adjacent building. Secant wall connects into typical basement wall as well. 3.) Service Elevator and one of the passenger elevators stop at level 1, walls are transferred onto beams and columns below grade.